Embed Code



Previous Gallery: Volleyball Opens Practice
Next Gallery: First Football Practice
480
640
Kibbie Dome Renovation
The first look at the inside of the new-look Kibbie Dome, including the new Litehouse Center on the South side of the stadium.
205962778
Spencer Farrin (Moscow, Idaho)
640
480
Kibbie Dome Renovation
Field-level view of the new Litehouse Center on the South side of the Kibbie Dome.
205962789
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
A full look at the new Bob Curtis Press Box.
205962795
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
A peek at the new paint treatment in the North Concourse. Both concourses will feature fresh, bright paint jobs for the new season.
205962796
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
The two-level seating in the lower press area of the Bob Curtis Press Box.
205962798
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
A 50-yard-line field view from the lower press box area.
205962797
Spencer Farrin (Moscow, Idaho)
426
640
Kibbie Dome Renovation
A view of the tiered seating in the upper press area of the Bob Curtis Press Box.
205962799
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
A look at the visiting radio booth in the new Bob Curtis Press Box.
205962800
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
One of the restrooms in the new Bob Curtis Press Box.
205962801
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
A look at the nearly-complete East End Wall.
205962779
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
A look at the lower press box seating area.
205962780
Spencer Farrin (Moscow, Idaho)
426
640
Kibbie Dome Renovation
The new Bob Curtis Press Box, viewed from the center of midfield.
205962781
Spencer Farrin (Moscow, Idaho)
426
640
Kibbie Dome Renovation
The West End Wall, viewed from the center of the football field.
205962782
Spencer Farrin (Moscow, Idaho)
426
640
Kibbie Dome Renovation
A view of the new South side of the stadium from the center of midfield.
205962783
Spencer Farrin (Moscow, Idaho)
426
640
Kibbie Dome Renovation
The new East End wall with video boards installed.
205962784
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
A look at the Litehouse Center from the 50-yard-line. Notice that the football field now faces North to accommodate the TV cameras in the new press box.
205962785
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
A look at the lower premium seating area in the Litehouse Center on the South side of the field.
205962786
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
Two of the six premium suites on the South side of the stadium.
205962787
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
A view of the field from the Bud and June Ford Club Area.
205962788
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
Upstairs at the Bud and June Ford Club Area.
205962790
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
The video boards have been re-installed on the new East End Wall.
205962791
Spencer Farrin (Moscow, Idaho)
640
426
Kibbie Dome Renovation
You'll have a difficult time finding a better seat in the world of college football.
205962792
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
We really think you're going to like these seats.
205962793
Spencer Farrin (Moscow, Idaho)
480
640
Kibbie Dome Renovation
A look inside the President's Box on the South side of the stadium.
205962794
Spencer Farrin (Moscow, Idaho)
426
640
Track Renovation
The South straightaway, which will house the seating area outside the track, and three long jump runways inside.
205962802
Spencer Farrin (Moscow, Idaho)
426
640
Track Renovation
The North straightaway and pole vault area, which will house four total vaulting areas.
205962804
Spencer Farrin (Moscow, Idaho)
426
640
Track Renovation
A view from the East side of the track with one of the facility's two shot put rings, and just beyond, the concrete base of the discus/hammer ring.
205962805
Spencer Farrin (Moscow, Idaho)
426
640
Track Renovation
The West curve of the track. The paved area just inside the track is the future javelin runway. Also in this area will be two high jump pits and one pole vault area.
205962806
Spencer Farrin (Moscow, Idaho)
426
640
Track Renovation
A view of the track from the West, facing the Kibbie Dome and campus.
205962807
Spencer Farrin (Moscow, Idaho)
